Workpackage 05 - Establish and maintain an associates network

Attached is the first draft of the WP05. This is a a crucial workpackage as it will draw a significant part of the budget and together with WP01 (Project set-up) and WP03 (Events, training, toolkits and follow through) will define the distinct nature and modus operandi of the OIE.

AttachmentSize
WorkpackageWP05v1.xls 31.5 KB
Syndicate content